Cost Efficiency, Hospital Building, Project Acceleration, Schedule Control, Time ManagementAbstract
This study evaluates the implementation of project time acceleration management in the construction of the 8-story Inpatient Building of Banten Provincial General Hospital. The project duration was reduced from 14 months to 7 effective months due to funding delays and the urgent need to improve healthcare services. The study employed a quantitative descriptive case study using project document review, cost budget plan (RAB) evaluation, concrete strength conversion analysis, schedule evaluation, interviews, and field observations. The project involved the construction of an eight-story hospital building supported by 344 bored piles (0.80 m diameter, 20 m depth), concrete with a design strength of 25 MPa, and a slump value of 18 ± 2 cm to maintain construction quality during the accelerated schedule. The results indicate that the acceleration strategy through resource optimization, additional working hours, and rescheduling successfully reduced the implementation period by 50% while maintaining construction quality and improving project implementation efficiency through lower indirect costs and faster project cash flow. The findings demonstrate that data-based project time management can effectively support schedule control in public building construction without compromising technical quality.
References
[1] M. A. Musarat, W. S. Alaloul, dan M. S. Liew, “Impact of inflation rate on construction projects budget: A review,” 1 Maret 2021, Ain Shams University. doi: 10.1016/j.asej.2020.04.009.
[2] RICS, “How can industry handle volatile inflation?” Royal Institution of Chartered Surveyors, 2021.
[3] M. F. Pohan, I. Putu, A. Wiguna, dan K. Kunci, “Jurnal Impresi Indonesia (JII) Analisis Faktor-Faktor Yang Berpengaruh Terhadap Kinerja Biaya Pada Proyek-Proyek Rancang Bangun Divisi Gedung PT. XYZ,” Jurnal Impresi Indonesia (JII), vol. 4, no. 8, hlm. 2875–2893, doi: https://doi.org/10.58344/jii.v4i8.6899.
[4] W. Xie, B. Deng, Y. Yin, X. Lv, dan Z. Deng, “Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation” Buildings, vol. 12, no. 11, Nov 2022, doi: 10.3390/buildings12112028.
[5] BI, “Inflasi Tahunan,” Bank Indonesia.
[6] BPS, “Tingkat inflasi Tahunan,” Badan Pusat Statistik.
[7] M. RA. Simanjuntak dkk., Manajemen Proyek Konstruksi, 1 ed. Batam: Yayasan Cendekia Mulia Mandiri, 2023.
[8] S. Shidiq Ma’mury dan A. Firmanto, “Analisis Manajemen Konstruksi Proyek Pembangunan PT. Tempoland Cirebon,” Jurnal Konstruksi, vol. 6, hlm. 651–668, 2017, Diakses: 9 November 2025. [Daring]. Tersedia pada: http://jurnal.ugj.ac.id/index.php/Konstruksi/article/view/3882/1923
[9] J. Ma, Q. Yang, X. Peng, dan K. Xia, “Review on Durability Deterioration and Mitigation of Concrete Structures,” 1 September 2025, Multidisciplinary Digital Publishing Institute (MDPI). doi: 10.3390/coatings15090982.
[10] A. Ibrahim, “Korelasi Koefisien Umur Terhadap Kuat Tekan Beton Yang Menggunakan Semen PCC (Portland Composite Cement),” 2021.
[11] M. Sigit Setyatama, “Studi Eksperimental Faktor Konversi Kuat Tekan Beton Mutu Normal Dan Tinggi Umur 3 Hingga 28 Hari: Pengaruh Jenis Semen PCC Dan PPC,” Universitas Islam Indonesia, Yogyakarta, 2024. Diakses: 10 November 2025. [Daring]. Tersedia pada: https://dspace.uii.ac.id/bitstream/handle/123456789/54264/20511042.pdf
[12] P. K. Mehta dan P. J. M. Monteiro, Concrete: Microstructure, Properties, and Materials, 3 ed. McGraw-Hill Education, 2014. doi: http://10.1036/0071462899.
[13] A. M. Neville, Properties of Concrete. England: Pearson Education Limited, 2011. Diakses: 10 November 2025. [Daring]. Tersedia pada: http://www.pearsoned.co.uk
[14] ACI Committee 308, “Guide to external curing of concrete,” American Concrete Institute, 2016.
[15] N. J. Carino dan H. S. Lew, “The maturity method: From theory to application,” dalam Structures - A Structural Engineering Odyssey, Structures 2001 - Proceedings of the 2001 Structures Congress and Exposition, 2004. doi: 10.1061/40558(2001)17.
Downloads
Published
Issue
Section
Citation Check
License
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share and adapt the work with an acknowledgement of the works authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journals published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Upon receiving the proofs, the Author/Editor agrees to promptly check the proofs carefully, correct any errors, and authorize the publication of the corrected proofs.