A Systematic Literature Review of Column Construction Management Practices for Improving Efficiency and Sustainability in Construction Projects

Authors

  • Kamelia malik Program Studi Teknik Sipil, Universitas Al-Azhar, Medan, Indonesia

DOI:

https://doi.org/10.33603/jki.v14i2.12411

Keywords:

BIM, Column Execution, Construction Management, Project Performance, Reinforced Concrete

Abstract

The management of reinforced concrete column execution is a critical element in construction projects, significantly influencing project efficiency and outcomes. This study employs a Systematic Literature Review (SLR) approach, supported by bibliometric analysis, to identify and synthesize optimization strategies for column execution work. Data were systematically collected from the Scopus, ScienceDirect, and Publish or Perish databases, covering publications from 2021 to 2026. The process yielded 1,396 publications, which were filtered using strict inclusion criteria to obtain 35 relevant articles. The results identify three primary issues in column execution: time inefficiency, cost overruns, and declining work quality, which are largely associated with inadequate field coordination. Bibliometric analysis using VOSviewer and RStudio reveals dominant research themes and their interrelationships, particularly planning, labor scheduling, quality control, cost control, and digital technology implementation. The SLR further establishes that integrated planning, structured labor scheduling, systematic quality control, cost monitoring, and Building Information Modeling (BIM) implementation constitute the main management strategies for improving column execution performance. These findings provide a consolidated management framework linking specific execution strategies to three key performance dimensions: time efficiency, cost efficiency, and execution quality. The review also identifies a research gap in the integration of column execution management with sustainability principles, as only a limited number of studies explicitly address both aspects. This study contributes an evidence-based synthesis of column execution management strategies and provides a foundation for developing more efficient, cost-effective, high-quality, and sustainable construction practices.

References

[1] G. J. Johari and S. Amarulloh, “Analisa Faktor Keberhasilan Proyek Kontruksi di Kabupaten Garut,” no. 1, doi: https://doi.org/10.33364/konstruksi/v.19-2.895.

[2] E. D. A. N. Sipil, F. R. Bandio, R. H. Nasution, and Z. H. Siregar, “ANALISIS KAPASITAS PRODUKSI MENGGUNAKAN METODE ROUGHT CUT CAPACITY PLANNING ( RCCP ),” 2022, doi: https://doi.org/10.54123/vorteks.v3i2.213.

[3] S. F. Rostiyanti, F. Fassa, and L. Sutanto, “EKSPLORASI FAKTOR KEBERLANJUTAN SOSIAL DALAM KONSTRUKSI BERKELANJUTAN,” vol. 3, no. 3, 2025, doi: 10.25077/jbkd.3.3.112-123.2025.

[4] M. Kripka, “Energy & Buildings Design optimization of a composite typology based on RC columns and THVS girders to reduce economic cost , emissions , and embodied energy of frame building construction,” vol. 336, no. February, 2025, doi: 10.1016/j.enbuild.2025.115607.

[5] S. Naumets, M. Lu, and K. Qi, “Time – cost combined optimization in planning infrastructure construction projects under environment induced time-window constraints,” Comput. Civ. Infrastruct. Eng., vol. 40, no. 31, pp. 6678–6700, 2025, doi: 10.1111/mice.70175.

[6] A. Waqar, M. Houda, and M. Ahsan, “Tantangan Lingkungan,” vol. 18, 2025.

[7] B. Salam and D. Ramayanti, “Optimasi Pengelolaan Proyek dengan Sistem Manajemen Data Berbasis Web untuk Meningkatkan Efisiensi dan Akurasi Progres Pekerjaan di Fanaya Art Construction,” vol. 4, no. 2, pp. 220–225, 2025, doi: https://doi.org/10.30606/rjti.v4i2.3420.

[8] H. A. A, W. Salah, A. M. K. A, and M. A. M. A, “Tinjauan Ilmu Komputer tinjauan sistematis dan kerangka kerja sosio-teknis untuk integrasi digital .,” vol. 60, no. September 2025, 2026.

[9] U. Samudra, S. Science, U. N. Jakarta, P. Education, and U. N. Jakarta, “ANALISIS BIBLIOMETRIK : ANTISIPASI THE TUG FALL TECHNIQUE PENCAK SILAT,” no. Icsspeh 2024, 2025.

[10] H. Bashir, R. Musa, H. Ahmed, A. Zarooni, and U. Ojiako, “Machine Translated by Google Kepemimpinan Proyek dan Masyarakat manajemen proyek konstruksi Machine Translated by Google,” vol. 5, 2024.

[11] M. Jadallah and R. Alghamri, “Progressive collapse behaviour of reinforced concrete buildings under multiple column loss : Influence of slab type and beam depth,” vol. 115, no. October, 2025, doi: 10.1016/j.jobe.2025.114550.

[12] F. Shahin, “Innovative models for optimizing steel formwork weight in concrete column construction: A case study,” Results Eng., vol. 29, no. June 2025, p. 109033, 2026, doi: 10.1016/j.rineng.2026.109033.

[13] S. Omar, H. Felizzola, G. Adriana, and N. Arrieta, “Case Studies on Transport Policy Influence of public procurement characteristics on cost and time overruns in rural road construction projects : A descriptive analysis,” vol. 24, no. April 2025, 2026, doi: 10.1016/j.cstp.2026.101748.

[14] P. Civil, E. Journal, H. Adry, I. Sopacua, J. Mara, and A. N. M, “Evaluasi Kualitas Pelaksanaan Pekerjaan Kolom Beton Pada Proyek Pembangunan Gedung Baru RS Siloam Makassar,” vol. 6, no. 1, pp. 145–154, 2024, doi: https://doi.org/10.52722/c5ngzj54.

[15] J. A. Bamgbade, “Machine Translated by Google Teknologi kembaran digital infrastruktur : Paradigma baru untuk industri konstruksi masa depan,” vol. 77, 2024.

[16] S. Ahmed, J. Beaver, and K. Aaltonen, “Surat Produksi Bersih Menjelajahi penerapan prinsip ekonomi sirkular melalui strategi manajemen proyek berkelanjutan dalam proyek konstruksi .,” vol. 10, no. September 2025, 2026.

[17] P. Pramarta, “Integrasi Manajemen Proyek dan Teknologi Antena dalam Pengembangan Sistem Energi Berkelanjutan,” vol. 10, no. 1, pp. 537–543, 2026, doi: https://doi.org/10.35870/emt.v10i1.5474.

[18] H. Siregar and C. R. Planning, “ELEKTRO DAN SIPIL PENGGUNAAN METODE CAPACITY REQUIREMENT PLANNING ( CRP ) DENGAN APLIKASI POM FOR WINDOWS DALAM PERHITUNGAN KAPASITAS PRODUKSI ( STUDI KASUS INDUSTRI PENGOLAHAN TAHU XYZ ),” vol. 01, no. 01, pp. 20–29, doi: https://doi.org/10.54123/vorteks.v1i1.13.

[19] P. Dickemann, “Energi Terapan,” vol. 397, 2025.

[20] K. Hussain, H. Sun, N. A. C, and M. Iqbal, “Heliyon Penilaian faktor risiko terhadap adopsi Green , Lean , Six Sigma di,” vol. 10, 2024, doi: https://doi.org/10.1016/j.heliyon.2024.e32749.

[21] H. S. X. Zhang, “Machine Translated by Google Jurnal Penelitian Keselamatan berbasis pengetahuan yang inovatif untuk penilaian risiko keselamatan otomatis . Machine Translated by Google,” vol. 90, no. September 2023, pp. 272–294, 2024, doi: https://doi.org/10.1016/j.jsr.2024.05.011.

[22] Z. H. Siregar, U. N. Harahap, and M. Zurairah, “Perencanan Bahan Baku Menggunakan Metode Min-Max Pada PT . TALENTA Conference Series Perencanan Bahan Baku Menggunakan Metode Min-Max Pada PT . Pacific Palmindo Industri,” vol. 3, no. 2, 2020, doi: 10.32734/ee.v3i2.1073.

Downloads

Published

2026-10-13

Citation Check