Analysis of the Impact of Mud Pumping on Sleeper Damage on the Tanjung Karang – Rejosari Railway Line (Case Study of Tanjung Karang Regional Division IV)
DOI:
https://doi.org/10.33603/jki.v14i1.11977Keywords:
Mud Pumping, Concrete Sleeper, Railway, DCP, Track StabilityAbstract
This study analyzes the impact of mud pumping on track stability and damage to K-550-type monoblock concrete sleepers on the Tanjung Karang–Rejosari line (DIVRE IV Tanjung Karang). This Class I track, with a gauge of 1,067 mm, carries an annual load of 82,883.21 tons. Mud pumping causes water mixed with mud to rise to the surface of the ballast, which disrupts load distribution and the stability of the track structure. The research methodology comprises four main stages: (1) field observations at four critical locations (Km 13+8/9, Km 14+2/3, Km 25+2/3, and Km 28+5/6); (2) measurements using a Dynamic Cone Penetrometer (DCP) and a densometer to obtain RC, CBR, and Evd parameters; (3) track geometry evaluation to detect elevation deviations; and (4) technical analysis of sleepers based on an elastic modulus of 150,093.30 kg/cm² and a permissible stress of 210 kg/cm². The research results indicate that the most critical condition is at Km 25+2/3, with an RC value of 14.37 kN/m, a CBR of 3.85%, and an Evd of 41.6 MN/m². Overall, several segments have CBR values below the safe threshold (15–24%), indicating a significant decrease in ballast density due to mud pumping. Technical analysis confirms that mud accumulation disrupts the distribution of effective stress and accelerates sleeper deterioration. As a mitigation measure, it is recommended to install woven geotextile, replace the ballast material, and implement periodic monitoring using DCP/densometer instruments to maintain track stability within acceptable limits and extend the service life of the railway infrastructure.
References
[1] Peraturan Menteri Perhubungan. (2012). PM 60 Tahun 2012. p.8
[2] T. T. Nguyen, B. Indraratna, R. Kelly, N. M. Phan, and F. Haryono, “MUD PUMPING UNDER RAILTRACKS : MECHANISMS , ASSESSMENTS AND SOLUTIONS,” vol. 54, no. 4, pp. 59–80, 2019.
[3] B. Marquis and G. Robert, “Application of Nadal Limit in The Prediction of Wheel Climb Derailment,” pp. 1–8, 2011.
[4] Kementerian Perhubungan, “Perdirjen Perkeretaapian Nomor KU.203/SK.298/DJKA/12/15,” 2015, Kementerian Perhubungan, Jakarta.
[5] S. Kumar, “Natural Frequencies of Beams with Axial Material Gradation Resting on Two Parameter Elastic Foundation,” vol. 19, no. 6, 2022.
[6] P. Punetha, “Dynamic Behaviour of Ballasted Railway Track with Special Reference to Transition Zones,” no. January, 2022.
[7] PT. KAI, “Peraturan Dinas No.10 KAI 1986,” 1986.
[8] S. F. Akbar, “Analisis Skilu pada Rel Lengkung No 14 KM 7+931-8+071 dan No 15 KM 8+137-8+253 di DIVRE IV Tanjung Karang (Studi Kasus Lintas Garuntang-Tanjung Karang),” 2024.
[9] S. S. Rao, Fifth Edition.
[10] Badan Standardisasi Nasional, “Komite Teknis 45-02 RSNI2 8828-1-2019,” 2019.
[11] Pemerintah Republik Indonesia, “Peraturan Pemerintah RI No.72 Tahun 2009 tentang Lalu Lintas dan Angkutan Kereta Api,” 2009.
[12] W. Hasyim and Y. Prakasa, “Performance of Recycled Concrete Made from Railway Sleeper : Experimental Study,” vol. 4, no. 2, pp. 104–112, 2021.
[13] H. R. Iqbalian and M. R. Radyanto, “Perbaikan Berkelanjutan Melalui Pengendalian Kualitas Pada Produk Bantalan Rel Kereta Dengan Menerapkan Metode Quality Control Circle ( QCC ) dan Lean Six Sigma ( LSS ) Pada PT Balton Kurnia Abadi,” vol. 19, no. 2, pp. 365–372, 2022.
[14] D. N. Little, W. W. Crockford, and V. K. R. Gaddam, “Resilient Modulus of Asphalt Concrete,” no. 2, 1992.
[15] B. Prediction, “University of Newcastle Research Online,” vol. 31, no. 100651, 2021.
[16] A. Yuliyanto, G. R. Prayogi, F. D. Hutabarat, M. Abi, and B. Nadi, “Evaluasi rel dan bantalan berdasarkan beban angkut lintas dan kinerja operasi kereta api ( studi kasus : jalan rel Tanjung Karang- Rejosari ),” vol. 13, pp. 26–34, 2024.
[17] S. T. Ageng, S. Yulindasari, and K. Edi, “Metode Penanganan Mud Pumping pada Jalan Rel Wilayah UPT Resor Jalan Rel III.3 Payakabung,” J. Ilm. Indones., vol. 8, no. 4, 2023.
[18] Pemerintah Republik Indonesia, “PM No.31 Tahun 2011,” 2011.
Downloads
Published
Issue
Section
Citation Check
License
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share and adapt the work with an acknowledgement of the works authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journals published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Upon receiving the proofs, the Author/Editor agrees to promptly check the proofs carefully, correct any errors, and authorize the publication of the corrected proofs.