Comparative Analysis of BIM-Based Quantity Take Off and Manual BOQ in Building Structural Work
DOI:
https://doi.org/10.33603/jki.v14i1.11485Keywords:
Bill of Quantity, Building Information Modeling, Quantity Take-Off, Tekla StructuresAbstract
Quantity take-off (QTO) calculation is an important component in cost estimation and material control in construction projects. Manual methods based on 2D drawings and Bill of Quantities (BOQ) are prone to inconsistencies due to the global volume addition approach and do not always follow the actual geometric cuts. This study compares the results of QTO based on Building Information Modeling (BIM) using Tekla Structures with manual BOQ on the structural work of the Tegal City Public Service Mall Building. The analysis focused on three materials: concrete, formwork, and reinforcement including foundation elements, beams, columns, slabs, and stair slabs. The results show that the total BIM volume produces 1,989.49 m³ of concrete, 6,857.70 m² of formwork, and 302,817.10 kg of reinforcement, while the BOQ recorded 2,025.37 m³, 7,305.17 m², and 303,502.10 kg. The deviations were 1.77%, 6.13%, and 0.23%, respectively. The differences were mainly influenced by automatic geometry truncation in the 3D model, the separation of specific elements such as pitlift walls, and inconsistent reinforcement rules (clear span, overlap, and development length) in manual calculations. These findings confirm that BIM-based QTO and BOQ can produce significant quantity differences in some elements, and identify recurring sources of deviations that can be used as a basis for quantity audits and improve calculation consistency across similar projects.
References
[1] D. Olsen and J. M. Taylor, “Quantity Take-Off Using Building Information Modeling (BIM), and Its Limiting Factors,” Procedia Eng., vol. 196, pp. 1098–1105, 2017, doi: 10.1016/j.proeng.2017.08.067.
[2] Z. Shen and R. R. A. Issa, “Quantitative evaluation of the BIM-assisted construction detailed cost estimates,” Electron. J. Inf. Technol. Constr., vol. 15, no. March, pp. 234–257, 2010.
[3] A. Monteiro and J. Poças Martins, “A survey on modeling guidelines for quantity takeoff- oriented BIM-based design,” Autom. Constr., vol. 35, pp. 238–253, 2013, doi: 10.1016/j.autcon.2013.05.005.
[4] M. A. Vigneault, C. Boton, H. Y. Chong, and B. Cooper-Cooke, “An Innovative Framework of 5D BIM Solutions for Construction Cost Management: A Systematic Review,” Arch. Comput. Methods Eng., vol. 27, no. 4, pp. 1013–1030, 2020, doi: 10.1007/s11831-019-09341-z.
[5] P. Pishdad and I. O. Onungwa, “Analysis of 5D Bim for Cost Estimation, Cost Control, and Payments,” J. Inf. Technol. Constr., vol. 29, no. June, pp. 525–548, 2024, doi: 10.36680/j.itcon.2024.024.
[6] S. Banihashemi, S. Khalili, M. Sheikhkhoshkar, and A. Fazeli, “Machine learning-integrated 5D BIM informatics: building materials costs data classification and prototype development,” Innov. Infrastruct. Solut., vol. 7, no. 3, p. 215, 2022, doi: 10.1007/s41062-022-00822-y.
[7] J. Cassandro, A. Farina, C. Mirarchi, and A. Pavan, “Cost estimation practices: a comparative analysis of traditional 5D BIM and IFC methods,” Proc. CIB W78 Conf., p. 10, 2024, [Online].
Available: https://re.public.polimi.it/handle/11311/1280790
[8] S. Alathamneh, W. Collins, and S. Azhar, “BIM-based quantity takeoff: Current state and future opportunities,” Autom. Constr., vol. 165, p. 105549, 2024, doi: 10.1016/j.autcon.2024.105549.
[9] D. G. R. Tanaya, I. N. D. P. Putra, and A. R. Nauli, “A Comparative Analysis of Material Quantity Calculation between Manual Method and BIM Method in High-rise Building,” J. TESLINK Tek. Sipil dan Lingkung., vol. 6, no. 2, pp. 353–364, 2024, doi: 10.52005/teslink.v6i2.410.
[10] R. Saavedra, W. Meléndez, and G. Garcés, “Comparative Analysis of Quantity Take-Off in Concrete, Steel Bars and Formwork in Apartment Buildings Based on Cad and Bim
Methodologies,” J. Inf. Technol. Constr., vol. 30, no. October 2023, pp. 159–184, 2025, doi: 10.36680/j.itcon.2025.008.
[11] A. Mishra, A. Hasan, and K. N. Jha, “A Holistic Evaluation of BIM Implementation Barriers in the Indian Construction Industry: Pre- and Post-Adoption Perspectives,” Int. J. Constr. Educ. Res., vol. 20, no. 3, pp. 358–380, Jul. 2024, doi: 10.1080/15578771.2024.2320108.
[12] K. Das, S. Khursheed, and V. K. Paul, “The impact of BIM on project time and cost: insights from case studies,” Discov. Mater., vol. 5, no. 1, 2025, doi: 10.1007/s43939-025-00200-2.
[13] X. Hu and Y. Chen, “Impact of Bim on Project Performance,” Proc. Eur. Conf. Comput. Constr., 2023, doi: 10.35490/EC3.2023.293.
[14] C. S. T. do Carmo and E. D. Sotelino, “a Framework for Architecture and Structural
Engineering Collaboration in Bim Projects Through Structural Optimization,” J. Inf. Technol. Constr., vol. 27, no. April 2021, pp. 223–239, 2022, doi: 10.36680/j.itcon.2022.011.
[15] M. A. Rizki, A. Wahyuni, H. Hermawan, J. T. Sipil, F. Sains, and U. M. Sidoarjo,
“Effectiveness of Quantity Take Off In Self Managed Projects Through Building Information Modeling ( BIM ) Integration,” vol. 10, no. 2, pp. 1358–1363, 2025.
[16] Sapitri, R. Subagja, and B. Annisa, “Estimasi Quantity Take Off dan Simulasi Progress Pekerjaan Struktur dengan Pendekatan Building Information Modeling,” Cantilever J. Penelit.
dan Kaji. Bid. Tek. Sipil, vol. 13, no. 2, pp. 103–112, 2024, doi: 10.35139/cantilever.v13i2.366.
[17] Q. Zeng and P. Pishdad, “The evolution of sustainable building rating tools: a systematic
literature review,” Smart Sustain. Built Environ., vol. 14, no. 4, pp. 1230–1263, Jan. 2024, doi: 10.1108/SASBE-12-2023-0381.
Downloads
Published
Issue
Section
Citation Check
License
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share and adapt the work with an acknowledgement of the works authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journals published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Upon receiving the proofs, the Author/Editor agrees to promptly check the proofs carefully, correct any errors, and authorize the publication of the corrected proofs.