Digital Modeling and Planning of the Work Stages of the Superstructure of the Precision 3 Building at the South Jakarta National Police Headquarters Based on Building Information Modeling
DOI:
https://doi.org/10.33603/jki.v13i3.10660Keywords:
BIM implementation, DED drawings, digitization, planning the stages of work implementation,, superstructureAbstract
Technological advancements in the construction sector are growing massively, making digitalization a necessity. Through digitization, the process of planning, implementing, and managing projects can be done more efficiently and accurately, considering that all information related to the project is centralized in one integrated base. Building Information Modeling (BIM) is a digital system for building modeling that contains information about all aspects of a well-managed building. The object of this study will review the Precision 3 MABES POLRI South Jakarta Building by applying Building Information Modelling (BIM) based digitization. At MABES POLRI Precision 3 building project, the application of BIM has not been fully carried out, so it still uses conventional methods. In accordance with the Regulation of the Minister of PUPR No. 22/PRT/M/2018, the use of Building Information Modeling (BIM) must be applied to non-simple buildings with the criteria of building area above 2,000 m2 above 2 floors. The building, which began construction in February 2024, has a building area of 11,200 m2 consisting of 10 floors + 1 roof, which can be categorized as a non-simple building. Therefore, in this final project, the author intends to apply BIM for the method by modeling the concept of 4D and 5D applications of dimensional BIM which includes a 3D top structure model to get the right Quantity Take Off output and planning of implementation stages as a result of this research accompanied by detailed top structural elements, and planning the stages of implementing the top structure of the MABES POLRI Precision 3 Building project using Tekla Structures 2024 - Student Version software.
References
[1] H. Fardha Masri dan R. Anggraini, “EFISIENSI MENGGUNAKAN TEKNOLOGI BUILDING INFORMATION MODELLING (BIM) DENGAN AUTODESK REVIT DALAM PEKERJAAN RUSUN KEJAKSAAN TINGGI SUMATERA BARAT”.
[2] M. S. Hakim, “ANALISIS RENCANA ANGGARAN BIAYA PELAKSANAAN PEMBANGUNAN KOPERASI TKBM PELABUHAN BELAWAN,” 2022.
[3] N. Laurensia dan A. S. M. Susanty, “PENGENDALIAN PENJADWALAN WAKTU DAN NILAI PROYEK DENGAN METODE CPM, PERT DAN KURVA S (Studi kasus : Proyek Pembangunan Fly Over Cakung oleh”.
[4] J. Oberlyn Simanjuntak dan H. Putera Harefa, “ANALISIS PERBANDINGAN KOLOM PERSEGI DAN KOLOM BULAT DENGAN MUTU BETON, LUAS PENAMPANG DAN LUAS TULANGAN YANG SAMA,” 2021.
[5] H. Parung, M. W. Tjaronge, R. Djamaluddin, R. Irmawaty, A. A. Amiruddin, A. R. Djamaluddin, T. Harianto, A. B. Muhiddin, A. Arsyad dan d. H. St Nur, “Sosialisasi Aplikasi Teknologi Building Information Modelling (BIM) pada Sektor Konstruksi Indonesia,” 2019.
[6] A. Rachmayanti dan A. Rahmad Zulfikar, “PENGAMATAN PELAKSANAAN PEKERJAAN STRUKTUR KOLOM PADA PROYEK GEDUNG TERPADU PSIKOLOGI OLAHRAGA UNIVERSITAS NEGERI SURABAYA DI PT. NINDYA KARYA,” 2024.
[7] A. Ramadhan, “PENERAPAN KONSEP BUILDING INFORMATION MODELING (BIM) DENGAN AUTODESK REVIT DALAM MENDUKUNG PERENCANAAN GEDUNG HEMODIALISIS DI RSU NEGARA BALI,” 2023.
[8] T. Septian Yuwan Pratama Aji, D. Nursaleh dan D. Putra Arystianto, “METODE PELAKSANAAN PEKERJAAN BETON BERTULANG PADA STRUKTUR ATAS PROYEK GEDUNG DI UPT PERPUSTAKAAN PROKLAMATOR BUNG KARNO,” 2024.
[9] Standar Nasional Indonesia, “SNI 2847:2019,” Persyaratan Beton Struktural Untuk Bangunan Gedung dan Penjelasan, 2019.
[10] Kementrian PUPR, “MODUL 5,” PEMODELAN 3D, 4D, 5D, 6D, DAN 7D SERTA SIMULASINYA DAN LEVEL OF DEVELOPMENT (LOD), 2018.
Downloads
Published
Issue
Section
License
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share and adapt the work with an acknowledgement of the works authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journals published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Upon receiving the proofs, the Author/Editor agrees to promptly check the proofs carefully, correct any errors, and authorize the publication of the corrected proofs.