Analysis of Success Factors: Self-Management System Using The AHP Method At The Ji’rona Building Project ‘Aisyiyah Hospital Bojonegoro
DOI:
https://doi.org/10.33603/jgst.v9i2.10451Keywords:
AHP, Analysis of Success Factors, Hospital Building Project, Self-ManagementAbstract
Construction projects require an effective and efficient project management system to achieve the expected development goals. One of the developments in project management is the production of a self-managed project management system, which is a management system that the project owner manages by prioritizing the use of their resources. This study aims to determine the priority scale of the factors and criteria for success in self-management in the Ji’rona Building Construction Project of RSAB. The data collection technique used a quantitative descriptive questionnaire survey in this study. The study involved 24 respondents, including project owners, planning teams, implementation teams, supervisory teams/CM, and self-management expert respondents. The data analysis method uses the AHP (Analytical Hierarchy Process) method to make it easier to make decisions based on several alternative self-management success factors. Based on the results of data analysis, the research identified the results of ranking criteria and sub-criteria in the form of a diagram, as well as changes in the hierarchical structure of the research on the success factors of self-management success. The study concluded that the priority factors for the success of self-management in the Ji’rona RSAB Building Construction Project were quality 0.124, communication 0.120, risk management 0.116, stakeholder satisfaction 0.111, cost 0.110, administration 0.108, resources 0.107, time 0.101, and characteristics of the place 0.089.
References
Badan Pusat Statistik (BPS), Indikator Konstruksi Triwulan-I Vol. 18 No. 3 2024, Jakarta: Badan Pusat Statistik,2024.url:https://www.bps.go.id/id/publication/2024/07/01/017b6a8c4a26478170fb5a75/construction-indicator--1st-quarter-2024.html.
PMI, A Guide to the Project Management Body Of Knowledge (Pmbok® Guide) Sixth Edition, USA: Project Management Institute, Inc., 2017. url: https://knowdemia.com/ebook/pmbok-6th-edition-pdf-free-download-pdf/.
B. A. Permana and I. N. D. P. Putra, "Analysis of Factors Affecting The Success of The Design And Build Contract On The Kediri Regency Stadium Construction Project," Indonesian Journal of Science, Technology and Humanities, vol. 2, no. 2, pp. 78-88, 2024, doi: https://10.60076/ijstech.v2i2.755.
Jamal, A. Musyafa, F. AM, and F. Nugraheni, "Success Factor Management Analysis of Self-Management System For Building Projects," International Journal of Engineering, Technology and Natural Sciences, vol. 4, no. 2, pp. 111-118, 2022, doi: https://10.46923/ijets.v4i2.176.
A. Azza, Y. Arye, S. Putri, and J. Aryadinata, "Manajemen Proyek Dalam Manajemen Sistem Informasi: Metodologi Tinjauan Literatur Sistematis," Djtechno : Jurnal Teknologi Informasi, vol. 4, no. 2, pp. 331-343, 2023, doi: https://10.46576/djtechno.
Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah. (2021). Peraturan Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah Republik Indonesia Nomor 3 Tahun 2021 Tentang Pedoman Swakelola. url: https://jdih.lkpp.go.id/regulation/peraturan-lkpp/peraturan-lkpp-nomor-3-tahun-2021
Peraturan Presiden Republik Indonesia (2025). Peraturan Presiden Republik Indonesia Nomor 46 Tahun 2025 Tentang Perubahan Kedua Atas Peraturan Presiden Nomor 16 Tahun 2018 Tentang Pengadaan Barang/Jasa Pemerintah. url: https://peraturan.bpk.go.id/Details/318647/perpres-no-46-tahun-2025
S. Soenarno, "Analisis Biaya Penebangan Sistem Swakelola: Studi Kasus Di Dua Iuphhk-Ha Kalimantan Tengah," Jurnal Penelitian Hasil Hutan, vol. 35, no. 2, pp. 101-114, 2017, doi: https://10.20886/jphh.2017.35.2.101-114.
A. T. Lagonda, P. A. K. Pratasis, and J. Tjakra, "Analisis Penerapan Manajemen Waktu Pada Proyek Konstruksi (Studi Kasus: Office and Distribution Center, Airmadidi, Minahasa Utara)," TEKNO, vol. 19, no. 78, pp. 171-185, 2021, doi: https://10.35793/jts.v19i78.35555.
I. Yurrazak, B. Susetyo, and A. Suroso, "Analisis Pengaruh Sistem Manajemen Mutu Terhadap Kualitas Proyek Pada Proyek Konstruksi Gedung Bertingkat Tinggi," Syntax Literate: Jurnal Ilmiah Indonesia, vol. 7, no. 7, pp. 10062-10077, 2022, doi: https://10.36418/syntax-literate.v7i7.895.
H. Pasarela, "Pengantar Manajemen Sumber Daya Manusia," CiDEA Journal, vol. 2, no. 2, pp. 66-75, 2023, doi: https://10.56444/cideajournal.v2i2.1277.
M. R. S. Alim and A. Rahman, "Analisis Manajemen Administrasi Proyek Pembangunan Gedung Universitas Muhammadiyah Semarang," Jurnal Pendidikan Tambusai, vol. 6, no. 1, pp. 923-930, 2022, doi: https://10.31004/jptam.v6i1.3024.
A. Madeppungeng, D. E. Intari, and N. N. Fauziah, "Evaluasi Kepuasan Pelanggan Terhadap Kinerja Manajemen Proyek Kontraktor Besar (Studi Kasus : Proyek Pembangunan Bendungan Karian Di Kabupaten Lebak, Banten)," Jurnal Konstruksia, vol. 10, no. 1, pp. 9-22, 2018, doi: https://10.24853/jk.10.1.9-22.
R. A. Darmawan and R. F. Prasetyo, "Efektifitas Komunikasi Proyek Konstruksi Saat Pandemi Dari Sudut Pandang Kontraktor," Construction Engineering and Sustainable Development, vol. 6, no. 1, pp. 17-23, 2023, doi: https://10.25105/cesd.v6i1.17153.
Peraturan Pemerintah. (2021). Peraturan Pemerintah (PP) Nomor 16 Tahun 2021 tentang Peraturan Pelaksanaan Undang-Undang Nomor 28 Tahun 2002 tentang Bangunan Gedung. url: https://peraturan.bpk.go.id/Details/161846/pp-no-16-tahun-2021
Z. Citra, B. Susetyo, and P. Wibowo, "Optimasi Kinerja Proyek Dengan Penerapan Metode Crashing Dan Linear Programming Pada Proyek Bulk Godown," Rekayasa Sipil, vol. 7, no. 2, 2019, doi: https://10.22441/jrs.2018.v07.i2.05.
A. Suprapto, E. Wulandari, and H. T. Tjendani, "Analysis of Contractual Based Construction Implementation and SelfManaged Construction Implementation Based on Community Empowerment," International Journal of Social Science and Community Service, pp. 179-187, 2024, doi: https://10.70865/ijsscs.v2i3.30.
J. Awad and C. Jung, "Extracting the Planning Elements for Sustainable Urban Regeneration in Dubai with AHP (Analytic Hierarchy Process)," Sustainable Cities and Society, vol. 76, 2022, doi: https://10.1016/j.scs.2021.103496.
A. Capryani, A. W. Nugroho, V. H. L. Saputri, and Yuniaristanto, "Pemilihan Lokasi Kantor Menggunakan Metode Analytical Hierarchy Process (AHP) (Studi Kasus: PT. Monang Sianipar Abadi Surakarta)," Performa : Media Ilmiah Teknik Industri, vol. 15, no. 1, pp. 26-34, 2016, doi: https://10.20961/performa.15.1.13744.
Downloads
Published
Issue
Section
Citation Check
License
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International License that allows others to share and adapt the work with an acknowledgement of the works authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journals published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Upon receiving the proofs, the Author/Editor agrees to promptly check the proofs carefully, correct any errors, and authorize the publication of the corrected proofs.